Street lighting poles
Specify height, cross-section, wall thickness, base plate and finish for the project loads and conditions.

Specify height, cross-section, wall thickness, base plate and finish for the project loads and conditions.

Review the mast, headframe, lowering system where applicable and floodlight arrangement together.

Structural and finish options for urban luminaires. Dimensions and fixings are specified for each installation.

Review outreach, arrangement and pole and luminaire connections against the expected loads.

Check diameters, fixings, cable entries and orientation before specifying the installation.

Share drawings and structural, electrical and finish requirements to review the configuration.
Poles and mounting systems
We review height, dimensions, materials, finish, design loads and fixings alongside the selected luminaire.
Specify height, cross-section, wall thickness, base plate and finish for the project loads and conditions.
Review the mast, headframe, lowering system where applicable and floodlight arrangement together.
Structural and finish options for urban luminaires. Dimensions and fixings are specified for each installation.
Review outreach, arrangement and pole and luminaire connections against the expected loads.
Check diameters, fixings, cable entries and orientation before specifying the installation.
Share drawings and structural, electrical and finish requirements to review the configuration.

Review the mast, headframe, lowering system where applicable and floodlight arrangement together.
Share the drawings so we can review connection dimensions and luminaire compatibility.

Ask about a product
Include the mounting height, luminaire model, location, quantities and target delivery date.
PROJECT ANSWERS
The model, power, optics, mounting, power supply, accessories, quantities, packaging and delivery requirements.
Tell us about your projectShare the application, site dimensions, mounting height, location and quantities so we can review the options.
Catalogues, datasheets, IES or LDT files, drawings and installation instructions. Available certificates and reports depend on the model and configuration.
The indicative lead time is 45 days. We confirm timing according to the configuration and order quantity. Transport is arranged separately.