WhatsApp
LUXiFiC
DEMANDER UN DEVIS

Resources

Outdoor lighting guides

Practical guidance on luminaire selection, supplier evaluation and light distribution.

Luminaires undergoing factory inspection
01

6 min read

How to choose LED luminaires for streets and roads

Selecting a road luminaire starts with the road layout, pole arrangement and lighting criteria.

Luminaire selectionRead guide
02

6 min read

How to assess a street lighting manufacturer

Alongside products and prices, review how a manufacturer specifies configurations, controls production and documents each order.

Manufacturer evaluationRead guide
03

6 min read

Type I–V light distributions: choosing an optic

Distribution categories help describe how a luminaire directs light.

Light distributionRead guide

Ask about a product

Choose a series and review the installation

Tell us where the luminaires will be installed, the mounting height and the quantity. Include the lighting requirements and target delivery date.

Tell us about your project

PROJECT ANSWERS

What needs to be confirmed before production?

The model, power, optics, mounting, power supply, accessories, quantities, packaging and delivery requirements.

Tell us about your project

Which documents can I request?

Catalogues, datasheets, IES or LDT files, drawings and installation instructions. Available certificates and reports depend on the model and configuration.

What is the production lead time?

The indicative lead time is 45 days. We confirm timing according to the configuration and order quantity. Transport is arranged separately.